Writing the Friday update from the log

Writing the Friday update from the log

Stakeholders want one clear note, not a slide you rebuilt by hand.

Colleagues around a laptop

WRITTEN BY

Tomas Okafor

PUBLISHED

READING TIME

5 min read

IN SHORT

01

Readers want one clear note, not a rebuilt slide.

02

A good log already holds the update.

03

Trust grows when the note matches the work.

Nobody enjoys assembling a status update. Everyone enjoys reading a clear one. At Marlowe, three leads spent most of every Friday afternoon doing the first so that forty people could do the second.

Where Friday went

Each lead opened the same tools, copied the same numbers into the same slide, then rewrote it so it sounded calm. The work took two hours, and the slide was out of date by Monday morning.

Stakeholders replied with questions the slide could not answer, which meant a second round of chasing the following week.

Moving to the log

If the log already records what moved and why, the update can write itself and stay honest. Marlowe started with one rule: every date change gets one line saying what changed and who decided.

Within a month the Friday note was a filtered view of that log, with a sentence on top from whichever lead owned the week. It took ten minutes, and nobody had to soften the numbers.

What changed for readers

The note got shorter, and it started to include the things that had gone wrong. Executives stopped asking for separate briefings, because they could finally see the reasons as well as the dates.

The time you get back is the best part, but trust is the bigger win. People believe an update more once they know nobody polished it.

If the log records what moved, the update writes itself.

KEEP READING

More on

holding the date.

Short reads for the people who answer when a launch moves.

KEEP READING

More on

holding the date.

Short reads for the people who answer when a launch moves.

Turn reading

into a forecast.

Bring your next launch and see the real date in three minutes.

  • SHIP DATE MAR 24

  • ON TRACK

  • 12 FIXES APPLIED

  • 3 WEEKS SAVED

  • SHIP DATE APR 02

  • ON TRACK

  • 9 RISKS CLEARED

  • SHIP DATE MAY 19

Turn reading

into a forecast.

Bring your next launch and see the real date in three minutes.

  • SHIP DATE MAR 24

  • ON TRACK

  • 12 FIXES APPLIED

  • 3 WEEKS SAVED

  • SHIP DATE APR 02

  • ON TRACK

  • 9 RISKS CLEARED

  • SHIP DATE MAY 19

Create a free website with Framer, the website builder loved by startups, designers and agencies.